CASE STUDY

Asphalt Paving of a High School Track for Abide Builders, Inc.

Project Description

Biondi Paving, Inc. complete the HMA paving on this track.
3" HMA was placed in 2 Lifts.
The bottom lift was 1/2" HMA material, the top lift 3/8" HMA material.
The cross slope was 0.9%.
At the completion of the paving process and flood test there was no standing water on the track.