20024 Playground Asphalt Repair - Multiple Sites

Case Study

Project-Description-Image

Project Description

Remove & Replace Playground Asphalt at 2 Woodland Joint Unified School District

The playground asphalt pavement at Gibson Elementary School and Cache Creek High School was extremely distressed and need of replacement.

Result of the project

The result of the project replaced the distressed existing HMA pavement with a new increased HMA pavement and aggregate base structure with a seal coat and refreshed playground striping. This project was completed prior to the contracted completion date for the original contracted $ amount. There were no additional costs or charges to the Woodland Joint Unified School District.

Cache Creek HS

Before
After

Gibson ES

Before
After

Location

Cache Creek High School
14320 2nd Street Yolo, Ca. 95697

Gibson Elementary School
312 Gibson Road Woodland, Ca. 95695

Quotes

The district is good with the project.

Nicholas Baral